Catalent Expands Temperature-Controlled Clinical Supply Capabilities

Article

Catalent has announced that it plans to expand its Waigaoqiao Free Trade Zone (FTZ) facility in Shanghai, China, to increase capacity for temperature-controlled storage and distribution of clinical supplies, as well as additional secondary packaging capabilities.

The facility will be expanded by approximately 30,000 square feet (approximately 2,800 square meters), which will double the clinical storage capacity and allow the installation of additional refrigerated (between 2 and 8 degrees Celsius) and deep-frozen (between minus 70 and minus 90 degrees Celsius) storage. The expansion and commissioning are expected to be completed by mid-2022.

Read more about the expansion here.

Related Videos
Greg Ball, Founder, ASAP Process Consulting image credit screen shot from video
Janice Chang, CEO, TransCelerate BioPharma @ video screenshot.
Applied Clinical Trials and LabConnect
Cat Hall endpoint Clinical
OM1 Sonja Wustrack
Related Content
© 2024 MJH Life Sciences

All rights reserved.